Ayer Merbau Reclamation Phase 2

Proposed Reclamation at Ayer Merbau Phase 2

Description


The Ayer Merbau Phase 2 reclamation is another addition to the land surface area of Jurong Island in which one of the world’s largest oil refining and petrochemical hub was built as part of Singapore’s national development.

Halex has been awarded the job by East Marine to provide Shore Protection works in both the drain channels and the perimeter bund.


  • Client: JTC Corporation
  • Main Contractor: Dredging International
  • Year: 2018
  • Scope of work: Shore Protection Works
  • Sand Pumping Works